Emerson Micro Motion GDM Installation Manual page 14

Table of Contents

Advertisement

Planning
Figure 1-6:
Meter installation in differential pressure application
G
A.
Meter isolation valves
B.
Flowmeter
C.
Venting valve
D.
Flow control needle valve
E.
Filter
F.
Differential pressure transmitter
G.
Thermal insulation
H.
Vent/vacuum test point
Note
Do not insulate the transmitter (electronics) and maintain a nominal 1-in clearance between the insulation and the transmitter
housing.
With the differential pressure installation method:
10
C
B
A
The process gas flow bypasses the meter, but should be low enough [for example,
3
5 lt/hrs (0.176 ft
/hr)] to not be of significance.
The measured density is the upstream density.
The control valve and the flowmeter can be mounted on either side of the meter to
suit the installation and dependent on where the density point is.
H
GDM
STATUS
E
SCROLL
SELECT
D
A
F
Micro Motion
®
Gas Density Meters

Advertisement

Table of Contents
loading

Table of Contents