Installation; Installing The Device In A Brisk Ii Ac Unit - Dometic SMRTSTACRV Installation And Operation Manual

Smartstart rv soft start accessory
Table of Contents

Advertisement

Available languages

Available languages

SmartStart RV Soft Start Accessory
If the hose clamp does not easily align with the
I
compressor side slot, use the needle nose pliers
to guide it into place.
5. Continue pushing the hose clamp through the
mounting bracket until the worm screw is next to the
slot on the supply side of the device.
6. If the nuts on the bracket screws were loosened in
step 3, use the torque wrench and the #2 Phillips
screwdriver to tighten the nuts to 30 in. lbs (3.4 N·m).

7 Installation


WARNING: FIRE OR ELECTRIC SHOCK
HAZARD . Failure to obey the following
warnings could result in death or serious
injury .
• Shut off the gas supply, turn off the AC circuit breaker,
disconnect the 120 VAC power from the RV, and
disconnect the positive (+) 12 VDC terminal from the
supply battery before drilling or cutting into the RV
or before performing any preinstallation, installation, or
maintenance activities. Do not install the device unless
power to the AC unit is off.
• There is a risk of electrical shock from the energy
stored in the capacitors. Wait for five minutes after
the shutdown of equipment before performing any
preinstallation, installation, or maintenance activities.
• Make sure there are no obstacles such as wires or
pipes inside the RV's roof.
• Provide grounding in compliance with all applicable
electrical codes.

CAUTION: LIFTING HAZARD .
Use proper lifting technique and control when
lifting the AC unit. Failure to obey this caution could
result in minor or moderate injury.
NOTICE: Maintain the structural integrity of the RV roof.
The roof must be designed to support 130 lbs (59 kg)
when the RV is in motion. Normally, a 200 lb (91 kg)
static load design will meet this requirement. Failure to
follow this notice could result in damage to the rooftop
component, device, and/or the RV.
I
Never create a low spot on the RV roof.
EN
This section describes how to install the device. The
installation procedures and components vary by the AC
unit model.
Go to "Installing the Device in a Brisk II AC
Brisk II
Unit" on page 11.
Go to "Installing the Device in a Penguin II AC
Penguin II
Unit" on page 17.
Go to "Installing the Device in a Blizzard NXT
Blizzard
AC Unit" on page 20.
NXT
7 .1 Installing the Device in a Brisk II
AC Unit
NOTICE: Do not force the AC shroud during removal.
Failure to follow this notice can damage or break the
screw holes and require an AC shroud replacement.
This section describes how to access the installation
area, disconnect the existing wiring, mount the device,
install and connect the new wiring, and close the unit
after completing the installation in a Brisk II AC unit.
Installation
11

Advertisement

Table of Contents
loading

Table of Contents