The displays will indicate the test is in process and state which mode of night operation
the system is presently configured to.
A and E Structures
Manual LI TEST IN
PROCESS
Once the test is complete one of the 2 displays will be shown.
Manual LI TEST
PASS : )
System will return to configuration screen when test is completed.
System will reset within 5 minutes after the completion of the test
NOTE: If the test is not completed due to prompts not being followed, tests will time out
after 5 minutes and display:
RED
OR
OR
Manual LI TEST
LIT DONE
Manual LI TEST LIT
NOT DONE
1501 Route 34 South, Farmingdale, NJ 07727 Tel: (732)
919-3119 Fax: (732) 751-5778 www.dialight.com
Document No: 9100-127-1958-99 Rev F
D Structures
Manual LI TEST IN
PROCESS NWHT
Manual LI TEST FAIL
: (