MINAC Systems
USER MANUAL
63860.doc
6
OPERATION
6.1
Before Starting
1. Place the induction heating unit in its working position.
2. Fit a suitable induction coil to the hand held transformer; refer to paragraph 4.
Signal
socket X9
Water out
© For reproduction rights, see cover page.
To
avoid
personal
equipment's covers or panels. Under any circum-
stances, do not operate the equipment without the
covers and panels properly installed.
CORRECT VOLTAGE: Make sure that the supply
voltage matches the specifications.
PROTECTIVE GROUNDING: To avoid electric shocks,
make sure the protective grounding conductor for
the main power cable is connected to ground.
Figure 8. Supply input/output panel on rear of cabinet.
Revision A
31 January 2005
WARNING!
injury,
do
not
CAUTION!
WARNING!
open
the
Nameplate
Signal
socket X10
(for Twin)
Signal
socket 9.1
Signal
socket X10.1
(for Twin)
Water in
Page 23