Service Information; In This Chapter; Troubleshooting Checklist - Cobalt Digital Inc 9032-SD Owner's Manual

Standard definition analog to digital converter with frame synchronization
Table of Contents

Advertisement

Service Information

In This Chapter

This chapter includes the following sections:

Troubleshooting Checklist

Routine maintenance to this openGear
card, the following basic troubleshooting checklist may help identify the source of the problem. If the
module still does not appear to be working properly after checking all possible causes, please contact
your openGear
the "Contact Us" section at the end of this manual.
9032 Owner's Manual
Troubleshooting Checklist
Warranty and Repair Policy
TM
products distributor, or the Technical Support department at the numbers listed under
1.
Visual Review
as connectors not properly seated or loose cables. Check the module, the frame, and
any associated peripheral equipment for signs of trouble.
2.
Power Check
panel for the presence of power. If the power LED is not illuminated, verify that the
power cable is connected to a power source and that power is available at the power
main. Confirm that the power supplies are fully seated in their slots. If the power
LED is still not illuminated, replace the power supply with one that is verified to
work.
3.
Reseat the Card in the Frame
4.
Check Control Settings
manual and verify all user-adjustable component settings.
5.
Input Signal Status
valid signal is being supplied.
6.
Output Signal Path
receiving a valid signal.
7.
Module Exchange
be working correctly is an efficient method for localizing problems to individual
modules.
8.
Red Error Light – If the red error light is illuminated, verify that the frame sync is
set to the same reference that is being used on the back of the openGear
(REF1 LOOP or REF2 LOOP), and that the reference is properly terminated.
(V 2.0)
TM
product is not required. In the event of problems with your
Performing a quick visual check may reveal many problems, such
Check the power indicator LED on the distribution frame front
Eject the card and reinsert it in the frame.
Refer to the Installation and Operation sections of the
Verify that source equipment is operating correctly and that a
Verify that destination equipment is operating correctly and
Exchanging a suspect module with a module that is known to
TM
frame
Page 21 of 24

Advertisement

Table of Contents
loading

This manual is also suitable for:

Opeangear 9032

Table of Contents