Chapter 4. Installing the UPS, the master console, and the
SAN Volume Controller
There are several steps that you must perform to prepare for the installation of the
uninterruptible power supply (UPS), the master console, and the SAN Volume
Controller.
Attention: Before you start installing, ensure that you have everything that you
need for installation, including the customer-completed planning tables and charts
that are provided in the IBM System Storage SAN Volume Controller: Planning Guide.
These tables include the location of hardware, cable connection, and configuration
data information that you need to complete the installation procedures. If you are
connecting cables to switches that are currently in use, confirm with the customer
that it is safe for you to proceed. Go no further with these instructions until you
are satisfied that all the information is correct and valid.
Perform the following steps to prepare for installation:
1. Check all the parts and quantities against the parts shown in Figure 24. If any
Figure 24. Parts provided for installation in the rack
2. If you are installing UPSs, read through the safety and environmental notices.
© Copyright IBM Corp. 2003, 2006
piece is missing, contact the appropriate IBM representative.
1
5
3
1
SAN Volume Controller
2
SAN Volume Controller support rails (2)
3
UPS (2)
4
UPS rail kit
5
Power and signal cable
2
(X2)
4
3
(X2)
49