Texas Instruments TAS5602EVM2 User Manual
Texas Instruments TAS5602EVM2 User Manual

Texas Instruments TAS5602EVM2 User Manual

Audio power amplifier evaluation module

Advertisement

Quick Links

TAS5602EVM2 Audio Power Amplifier Evaluation Module
...................................................................................................................
1
Introduction
.....................................................................................................................
2
.....................................................................................................................
3
1
2
3
4
5
1
1
Introduction
1.1
Description
The TAS5602EVM2 evaluation module consists of a single class-D stereo audio power amplifier complete
with a small number of external components mounted on a circuit board that can be used to directly drive
speakers using a TAS3308 EVM as the input. The input connector for the TAS5602EVM2 is configured to
connect directly to the TAS3308 EVM PWM connector. The TAS5602EVM2 can be configured to drive 2
stereo BTL channels up to 20W/ch or 4 SE (single-ended) channels up to 10/ch. It is also possible to
configure the EVM to drive speakers in a 2.1 configuration with 2 channels of SE stereo and one channel
of BTL subwoofer. The user can also connect to the TAS5602EVM2 input with a ribbon cable from a
target system if desired.
This document assumes that the user has obtained a TAS3308 EVM and has set up the PurePath
Studio™ software on a test computer with USB interface. The Quick Setup Guide in the TAS3308 EVM
User's Guide (TI document SLEU093) describes a method to get the TAS3308 EVM up and running
efficiently.
The TAS3308 EVM outputs 6 PWM channels plus a VALID/SYNC signal. The six PWM channels are
grouped into three stereo channels named PWM1 L and R, PWM2 L and R, and PWM3 L and R. The
TAS5602EVM2 is configured to connect to PWM3, which consists of 4 output lines
1.2
TAS5602EVM2 Specifications
V
Supply voltage range
CC
I
Supply current
CC
Continuous output power per channel: 8 Ω BTL, VCC = 18 V, THD+N = 10%
P
O
R
Minimum load impedance,
L
PurePath Studio is a trademark of Texas Instruments.
SLAU258 - August 2008
Submit Documentation Feedback
Contents
List of Figures
............................................................................
..................................................................
.................................................................................................
........................................................................................
....................................................................................
List of Tables
............................................................................
TAS5602EVM2 Audio Power Amplifier Evaluation Module
User's Guide
SLAU258 - August 2008
1
2
5
2
3
5
6
6
7
VALUE
UNIT
10 to 26
V
4
A rms
20
W
4
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TAS5602EVM2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TAS5602EVM2

  • Page 1: Table Of Contents

    EVM to drive speakers in a 2.1 configuration with 2 channels of SE stereo and one channel of BTL subwoofer. The user can also connect to the TAS5602EVM2 input with a ribbon cable from a target system if desired.
  • Page 2: Operation

    Quick Start Guide for use with TAS3308 Digital Audio Signal Processor Follow these steps to use the TAS5602EVM2 along with the TAS3308 EVM. Power and speaker connections to the EVM module can be made by inserting stripped wire or using banana plugs for the power supply and output connections.
  • Page 3: Tas3308Evm/ Tas5602Evm2 External Connections

    Connect the TAS3308 EVM to TAS5602EVM2 Place the TAS3308 EVM and TAS5602EVM2 at the same height and let the 40 pin connector on each board face each other. Push them together carefully until they make a solid connection 9V Supply...
  • Page 4 TAS3308 EVM and use the Pure Path Studio GDE to select the correct Mux to route the audio signal to the PWM3 output. 3. Turn on the power supply for the TAS5602EVM2. LED2 next to the PVCC jack on the TAS5602EVM2 should be lit. Audio power should be reaching the speakers (loads) at this time.
  • Page 5: Reference

    Reference www.ti.com Reference TAS5602EVM2 Schematic Figure 3. TAS5602EVM2 Schematic SLAU258 – August 2008 TAS5602EVM2 Audio Power Amplifier Evaluation Module Submit Documentation Feedback...
  • Page 6: Tas5602Evm2 - Top Side Layout

    Reference www.ti.com TAS5602EVM2 PCB Layers Figure 4. TAS5602EVM2 – Top Side Layout Figure 5. TAS5602EVM2 – Bottom Side Layout TAS5602EVM2 Audio Power Amplifier Evaluation Module SLAU258 – August 2008 Submit Documentation Feedback...
  • Page 7: Bill Of Materials For Tas5602Evm2 - Bdbtl

    Reference www.ti.com Bill of Materials Table 1. Bill of Materials for TAS5602EVM2 – BDBTL REFERENCE MANUFACTURER ITEM DESCRIPTION MANUFACTURER DESIGNATORS PART NUM 20W 4 CH POWER AMP, HTSSOP56-DCA TEXAS INSTRUMENTS TAS5602DCA Transistor PNP 50V PreBiased/4.7K 100mA DIODES, INC. DDTA143TCA-7 SOT23-DBV3 LED, GREEN 2.0V SMD0805...
  • Page 8 EVALUATION BOARD/KIT IMPORTANT NOTICE Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation board/kit is intended for use for ENGINEERING DEVELOPMENT, DEMONSTRATION, OR EVALUATION PURPOSES ONLY and is not considered by TI to be a finished end-product fit for general consumer use. Persons handling the product(s) must have electronics training and observe good engineering practice standards.
  • Page 9 IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, modifications, enhancements, improvements, and other changes to its products and services at any time and to discontinue any product or service without notice. Customers should obtain the latest relevant information before placing orders and should verify that such information is current and complete.
  • Page 10 Mouser Electronics Authorized Distributor Click to View Pricing, Inventory, Delivery & Lifecycle Information: Texas Instruments TAS5602EVM2...

Table of Contents