Advertisement

www.ti.com
EVM User's Guide: TAS5827EVM
TAS5827 Evaluation Module
Description
The Texas Instruments' TAS5827EVM evaluation
module (EVM) helps designers evaluate the operation
and performance of the TAS5827 Digital Input,
Closed-Loop Class-D Amplifier. The TAS5827 is a
stereo high-performance closed-loop Class-D amp
with low power dissipation and advanced audio
processing. The graphical user interface or GUI called
PurePath
Control Console 3 is used to interface
with USB to the EVM. The EVM has optical SPDIF
inputs, I2S, TDM, and audio inputs through the USB
interface.
Get Started
1. Order the
TAS5827EVM
2. Download the latest version of the PurePath
Control Console 3 GUI (PPC3) and request
access to TAS5827-SW
3. Read the TAS5827EVM user's guide
4. Refer to the TAS5827
questions and support
Features
The integrated DSP of the TAS5827 enables
Class-H envelope tracking, eliminating the need
for development of complex tracking software or
an external microcontroller
SLOU569 – NOVEMBER 2023
Submit Document Feedback
data sheet
or
E2E
for
TAS5827EVM
Copyright © 2023 Texas Instruments Incorporated
Onboard LM5155 boost to evaluate Class-H
efficiency performance and provide customer
system design reference
Default system configuration: 5 V battery input,
boost to max 20 V power rail based on audio
envelope tracking
Optional hardware control mode to set switching
frequency, analog gain, BTL/PBTL mode and
Cycle by Cycle current limit through pin
configuration
Provides flexible input signal routing (USB, analog,
optical and external I2S)
Demonstration, evaluation and development
environment via the PurePath Console 3 software
(GUI)
Applications
LCD
TV,
OLED
TV,
Mobile smart
Mobile smart TV
Smart
speakers,
Smart
wireless speakers
Notebook
PC,
desktop PC/motherboard
Piano, keyboard,
synthesizer,
speaker systems
Professional conference
projectors
Description
TV,
Laser
TV,
displays,
sound
bars,
professional
systems,
enterprise
TAS5827 Evaluation Module
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TAS5827EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TAS5827EVM

  • Page 1 Control Console 3 GUI (PPC3) and request Mobile smart TV access to TAS5827-SW • Smart speakers, Smart displays, sound bars, 3. Read the TAS5827EVM user's guide wireless speakers 4. Refer to the TAS5827 data sheet • Notebook desktop PC/motherboard questions and support • Piano, keyboard,...
  • Page 2: Kit Contents

    1 Evaluation Module Overview 1.1 Introduction This user’s guide describes the operation of the TAS5827 Evaluation Modules (EVM). The TAS5827EVM is a stand-alone EVM. Use the PurePath Control Console 3 GUI (PPC3) to initialize and operate this EVM. To utilize...
  • Page 3 2. Connect a PSU to the TAS5827EVM and turn on the power. 3. Plug in a USB cable from the PC to the TAS5827EVM. The USB READY LED (Blue) is also illuminated. 4. If an optical source is used, then he blue SPDIF LOCK LED is illuminated.
  • Page 4 15 kΩ 7.4 V 33 kΩ 7.4 V PBTL 6.8 kΩ 14.7 V PBTL 1.5 kΩ 20.9 V PBTL 0 Ω 29.5 V PBTL TAS5827 Evaluation Module SLOU569 – NOVEMBER 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 5 The 3.3V rail used to power various components on the EVM. R33 can be removed and the 3.3V 3.3V driven externally to analyze current draw of this rail. SLOU569 – NOVEMBER 2023 TAS5827 Evaluation Module Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 6: Test Points

    OUT_B-. TP25 The 1 V rail used in the XMOS. All other TP Ground reference pins for probes. TAS5827 Evaluation Module SLOU569 – NOVEMBER 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 7 480kHz, 100kHz BW Enable 40% OCP 480kHz, 100kHz BW Enable 60% OCP SDA/HW_SEL1 SCL/HW_SEL0 0.1uF 1.0k 1.0k Figure 3-1. TAS5827EVM Schematic (1 of 5) SLOU569 – NOVEMBER 2023 TAS5827 Evaluation Module Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 8 1.8V 10.0k 51.0k 24MHz 2.2uF 47.0k TPS3897ADRYR 0.1uF 0.1uF 0.1uF 0.1uF 0.1uF USB I/O JTAG CLOCK GENERATION Figure 3-2. TAS5827EVM Schematic (2 of 5) TAS5827 Evaluation Module SLOU569 – NOVEMBER 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 9 C115 C116 C117 C118 C119 C120 0.1uF 0.1uF 0.1uF 0.1uF 0.1uF 0.1uF 0.1uF TCA6408ARGTR ADDR = 0x40 Figure 3-3. TAS5827EVM Schematic (3 of 5) SLOU569 – NOVEMBER 2023 TAS5827 Evaluation Module Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 10 PVDD PVDD_EXT 5V-SPDIF TPS76833QDR 5V-U3 3.3V 249k 3.3V-TP 0.1uF 3.3V TP10 TP11 TP12 10uF PVDD RANGE 4.5-26VDC Figure 3-4. TAS5827EVM Schematic (4 of 5) TAS5827 Evaluation Module SLOU569 – NOVEMBER 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 11 AMP_SCL AMP_SDA GPIO0_FAULT AMP_SCL GPIO1_Hybrid_Pro AMP_SDA LRCLK GPIO2_WARN LRCLK SCLK SCLK SDIN SDIN GPIO0_FAULT GPIO1_Hybrid_Pro GPIO2_WARN IO-EXT Figure 3-5. TAS5827EVM Schematic (5 of 5) SLOU569 – NOVEMBER 2023 TAS5827 Evaluation Module Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 12: Pcb Layout

    Hardware Design Files www.ti.com 3.2 PCB Layout Figure 3-6 Figure 3-7 illustrate the board layouts for the EVM. Figure 3-6. TAS5827EVM Top Overlay TAS5827 Evaluation Module SLOU569 – NOVEMBER 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 13 Hardware Design Files Figure 3-7. TAS5827EVM Bottom Overlay SLOU569 – NOVEMBER 2023 TAS5827 Evaluation Module Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 14 CAP, Aluminum Polymer, 100 uF, 50 Cornell Dubilier 100uF V, +/- 20%, 0.025 ohm, AEC-Q200 D10xL10mm HHXB500ARA101MJA0G Chemi-Con HZA107M050G24VT-F Electronics (CDE) Grade 2, D10xL10mm SMD TAS5827 Evaluation Module SLOU569 – NOVEMBER 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 15 C82, C83, C85, C86, C88, C89, C90, C91, C92, C93, C94, C95, C97, C99, C100, C104, C111, C114, C115, C116, C117, C118, C119, C120 SLOU569 – NOVEMBER 2023 TAS5827 Evaluation Module Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 16 V10PM6-M3/H Semiconductor - Q101, CFP15 Diodes Division D2, D3 Blue LED, Blue, SMD LED_0805 LTST-C170TBKT Lite-On Green LED, Green, SMD LED_0603 150060GS75000 Wurth Elektronik TAS5827 Evaluation Module SLOU569 – NOVEMBER 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 17 Ferrite, 10 uH, 7.1 A, 0.01294 ohm, 7447709100 Wurth Elektronik Inductor, Shielded, Composite, 6.8 Inductor, 6.8uH XAL1010-682MEB Coilcraft uH, 18.5 A, 0.01 ohm, SMD 11.3x10x10mm SLOU569 – NOVEMBER 2023 TAS5827 Evaluation Module Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 18 TE Connectivity 0000000 6.4x3.2mm ERJ-MS4SF4M0U Panasonic TLRP3A30WR004FTE Grade 0, 6.4x3.2mm Passive Product 0001E-3 68.0k RES, 68.0 k, 1%, 0.1 W, 0603 0603 RC0603FR-0768KL Yageo TAS5827 Evaluation Module SLOU569 – NOVEMBER 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 19 RES, 47.0 k, 1%, 0.0625 W, 0402 0402 RC0402FR-0747KL Yageo America RES, 49.9, 1%, 0.063 W, AEC-Q200 CRCW040249R9FKE R60, R65, R67 49.9 0402 CRCW040249R9FKED Vishay-Dale Vishay-Dale Grade 0, 0402 SLOU569 – NOVEMBER 2023 TAS5827 Evaluation Module Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 20 Testpoint TP21, TP22, TP23, TP24, TP25 TP8, TP9, TP10, TP11, Black Compact Keystone Test Point, Compact, Black, TH 5006 TP12, TP26, Testpoint Electronics TP27 TAS5827 Evaluation Module SLOU569 – NOVEMBER 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 21 Synthesizer with 2.5-V or 3.3- Texas PW0014A CDCE913PWR CDCE913PW Texas Instruments V LVCMOS Outputs, PW0014A Instruments (TSSOP-14) Dual-Bit Dual-Supply Bus Texas DQM0008A SN74AVC2T244DQMR Transceiver, DQM0008A (X2SON-8) Instruments SLOU569 – NOVEMBER 2023 TAS5827 Evaluation Module Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 22 Low-Voltage 8-Bit I2C and SMBus I/O Expander, 1.65 to 5.5 V, -40 to Texas RGT0016A TCA6408ARGTR 85 degC, 16-pin QFN (RGT), Green Instruments (RoHS & no Sb/Br) TAS5827 Evaluation Module SLOU569 – NOVEMBER 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 23 Number Manufacturer Crystal Oscillator 24 MHz ±50ppm SMD_2MM0_1 ASA-24.000MHZ-L-T Abracon HCMOS 3.3V SMD 2x1.6mm Abracon Crystal, 24.576 MHz, 10 pF, SMD 2.5x0.5x2.0mm ABM10-24.576MHZ-E20-T Corporation SLOU569 – NOVEMBER 2023 TAS5827 Evaluation Module Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 24: Additional Information

    Additional Information www.ti.com 4 Additional Information 4.1 Trademarks PurePath ™ is a trademark of Texas Instruments. All trademarks are the property of their respective owners. TAS5827 Evaluation Module SLOU569 – NOVEMBER 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 25 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 26 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 27 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 28 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 29 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2023, Texas Instruments Incorporated...
  • Page 30 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2023, Texas Instruments Incorporated...

Table of Contents