BOX CONTENTS
AM5 Mounting Standoff (4 pcs)
PREPARING THE AM4 WATER BLOCK FOR UPGRADE
THUMB NUT
COILED SPRING
STEP 1
Important! Before starting, make sure to have a clean, flat
surface to work on. It is recommended to put foam or soft
material to lay a motherboard on.
STEP 1
If the EK-Quantum Velocity Ryzen AM4 water block is already
installed, unscrew four (4) Thumb Nuts to detach it (As shown in the
picture). Save the parts for later use.
- 4 -
Need help?
Do you have a question about the EK-Quantum Velocity Ryzen Edition UNC Standoffs - AM5 and is the answer not in the manual?