TABLE OF CONTENTS
Section 3
SPECIFICATIONS
(CONTINUED)
Section 4
INSTALLATION
Section 5
SUPERVISOR
CONTROLLER
Section 6
OPERATION-
ELECTRO-MECHANICAL
PAGE
24
Figure 3-2B Piping and Instrumentation- LS-200 and
VCC-200 Air-cooled with Supervisor Controller
26
Figure 3-2C Piping and Instrumentation- LS-200 and
VCC-200 Water-cooled with Electro-mechanical Controller
30
Figure 3-2D Piping and Instrumentation- LS-200 and
VCC-200 Water-cooled with Supervisor Controller
34
Figure 3-3A Identification- LS-200 and VCC-200 Air-cooled
with Supervisor Controller (and Optional Enclosure)
35
Figure 3-3B Identification- LS-200 and VCC-200 Water-cooled
with Supervisor Controller (and Optional Enclosure)
37
37
37
37
37
38
39
39
39
40
Figure 5-1 Supervisor Controllerâ„¢ Control Panel
43
43
45
45
45
Continued ...