Requirements
2.2 Wiring the components
2.2
Wiring the components
The assembly and wiring of components according to the sample project depicted below
must always be undertaken by qualified specialists. For the purpose of commissioning this
sample project, it is not permissible to connect other components or drive loads to the motor.
Note
For information about assembling and wiring the components of the sample project, please
refer to the relevant chapters in the SINAMICS S120 Equipment Manual GH2.
14
All manuals and user guides at all-guides.com
Getting Started, 11/2009, 6SL3097-4AG00-0BP0
Getting Started