Another window containing the safety notes is displayed.
4. Read the notes and then close the window by clicking on the "Close" button.
5. In the "Assume control priority" window, click on button "Accept".
The window is closed and the control panel is activated.
6. Click on button "LM" (Line Module).
The infeed charges the DC link. A window with progress bar indicates the charging
status. The drive is enabled as soon as the DC link is fully charged. The check box
"Enables" then becomes available for selection.
7. Activate the check box "Enable signals".
Buttons "I" and "0" become available for selection.