Casing Removal; Variable Heat Power - Immergas HE COMBI INTERNAL Manual

Wall mounted heating only boiler
Table of Contents

Advertisement

3.15 CASING REMOVAL.

To facilitate boiler maintenance and to access
the control panel, the casing can be completely
removed as follows:
- remove the lower grid (1) by loosening the 4
7
3
Det. A
Part. A

3.16 VARIABLE HEAT POWER.

N.B.: the pressures indicated in the tables
between the gas valve outlet and the combustion
lower screw fasteners (2);
- remove the front (3) of the boiler by pushing it
upwards and at the same time pull it towards
yourself to release it from the lateral hooks (4)
and upper ones (5);
5
6
A
A
carried out using a di erential manometer
(small "U"-shaped column or digital manometer)
with the probes inserted in the pressure test gas
valve outlet and on the sealed chamber positive
- remove the sides (6) by loosening the screws
(7) and pulling towards yourself to free the side
from the seat (8) (Fig. 3-5).
Det. B
Part. B
5
1
2
4
is obtained with 0.5m long intake/exhaust pipe.
temperature of 15°C and pressure of 1013 mbar.
Burner pressure values refer to use of gas at 15°C.
22
8
B
B
7
A
A
6
7
3-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

He combi external

Table of Contents