Boiler Dimensions, Services & Clearances - External - Ideal Heating LOGIC+ SYSTEM S18 Installation & Servicing

Table of Contents

Advertisement

SECTION 1 - GENERAL
1.17 BOILER DIMENSIONS, SERVICES & CLEARANCES - EXTERNAL
The boiler connections are made on the boiler connection tails.
Refer to Section 2.19.
The following minimum clearances must be maintained for
operation and servicing.
Additional space will be required for installation, depending upon
site conditions.
all dimensions in mm
Underside View - Pipe Dimensions to Wall
Water Connections and Gas Connection
EXTERNAL ENCLOSURE
12
Installation and Servicing

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LOGIC+ SYSTEM S18 and is the answer not in the manual?

This manual is also suitable for:

Logic+ system s30

Table of Contents

Save PDF