Fig. 37: Installing The Cartridge Group; Table 45: Tightening Torque (51007) - ABB PT003888 Operation Manual

Table of Contents

Advertisement

Operation Manual / Power2 340-H / Low-pressure stage
9 Disassembly and assembly / 9.15 Installing the cartridge group
Installing the cartridge group
Fig. 37: Installing the cartridge group
Product
Size
Tightening torque [Nm]
Power2 340-H LP
M12
75
Table 45: Tightening torque (51007)
1. Coat the threads of the studs (51006) with high-temperature grease.
2. Align the casing position of the cartridge group to the marking.
3. Lower the cartridge group into the turbine casing.
4. Remove ring nuts and screws.
5. Fit fastening strips (51002) with Verbus Ripp® washers (51003) and hexagon
nuts (51007).
6. Tighten the hexagon nuts (51007).
© Copyright 2022 ABB. All rights reserved.
HZTL4053_EN
Rev.F
March 2022

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power2 340-h44

Table of Contents