Operation Manual / Power2 340-H / Low-pressure stage
15 Gas piping (option) / 15.1 Commissioning and operating
15

Gas piping (option)

15.1

Commissioning and operating

Checks before commissioning
All components of the gas piping must be checked visually:
¡
There must not be any damage to sealing surfaces (evenly fine surfaces)
¡
There must not be any visible damage to the bellows (e.g. dents, cracks, scratches or
weld spatters).
¡
All criteria mentioned also apply to the C-ring gaskets. Moreover, they must not exhibit
any buckling.
Checks after commissioning (engine in idle mode)
After starting the engine, check all gas pipes for leaks.
u
Discolourations on the insulation, the smell of exhaust gas and unusual noises (whistling,
hissing) can indicate small leaks. If such new and unusual signs are found, their cause must
be determined.
Noise emission
See chapter
Noise emission
Expected replacement interval
Product
Gas piping
Table 68: Expected replacement interval
© Copyright 2022 ABB. All rights reserved.
→45.
HZTL4053_EN
Replacement interval [h]
60000
Rev.F
March 2022