Periodic Maintenance; Foreword To Maintenance; Table 17 - ABB PT003888 Operation Manual

Table of Contents

Advertisement

Operation Manual / Power2 340-H / Low-pressure stage
7 Periodic maintenance / 7.1 Foreword to maintenance
7

Periodic maintenance

7.1

Foreword to maintenance

Maintenance work includes regular visual controls and cleaning operations which are inten-
ded to ensure the trouble-free functioning of the low-pressure and high-pressure stage.
In this process, the exterior condition and the degree of contamination of the components
on which maintenance work is to be performed are determined.
Component to be maintained Recommended cleaning inter-
LP & HP compressor ***
LP filter silencer **
HP bellows**
Table 17
* If the recommended cleaning intervals are incompatible with operation of the engine, con-
tact Turbo Systems.
** If present
*** If compressor cleaning present
Compressor cleaning
We recommend cleaning the HP compressor after the LP compressor.
On V-engines with several low-pressure and/or high-pressure stages per engine, Turbo Sys-
tems recommends the parallel cleaning of the LP compressors as well as the parallel clean-
ing of the HP compressors.
This cleaning process is faster and reduces the risk of surging of the low-pressure and high-
pressure stages.
© Copyright 2022 ABB. All rights reserved.
val*
24 ... 72 h
500 h
At every disassembly
HZTL4053_EN
Operating state
Engine load: 50 ... 85%
Engine stopped
Engine stopped
Rev.F
March 2022

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power2 340-h44

Table of Contents