PRITY GT Instructions For Installation And Operation Manual page 19

Solid fuel cooker
Table of Contents

Advertisement

Available languages

Available languages

PRINCIPLE DIAGRAM OF OPERATION OF AN APPLIANCE
WITH A WATER HEAT EXCHANGER IN A CLOSED SYSTEM
1. Control pressure gauge up to 4 bar
2. Thermometer 120° С
3. Electric(al) thermostat
4. Thermal safety valve
5. Automatic deaerator
6. Hydraulic safety valve 2.5 bar
GENERAL RULES AND RECOMMENDATIONS WHEN USING A COOKER
1. Before the construction of the installation it is recommended that the heat
losses be calculated by a specialist for the concrete case.
2. We recommend that the stove be connected to an open heating system, but
when connected to a closed system, it must be protected by a safety hydraulic
valve set at 2.5 bar.
3. To ensure deaeration of each branch and element of the installation at any
time of its operation.
4. All elements of the installation must be ensured against freezing, especially if
the expansion vessel or other parts of it are located in unheated premises. If
it is impossible to ensure non-freezing of any part of the installation,
propylene glycol has to be used instead of coolant water.
10. Circulation pump
11. Automatic complementary group set to 1.25 bar
Diagram II-2
WITH WATER HEAT EXCHANGER
7. Drainage
8. Closed expansion vessel inflated to 1.75 bar
9. Filter
EN
| 19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt w101p341p34 l1p34-kCp p342p41 ... Show all

Table of Contents