Display Assembly Replacement; Caution - MSA Orion Operation Manual

Multigas detector
Hide thumbs Also See for Orion:
Table of Contents

Advertisement

Available languages

Available languages

Chapter 6, Warranty, Maintenance and Troubleshooting

Display Assembly Replacement

Before handling the circuit boards, ensure you are properly
grounded; otherwise, static charges from your body could
damage the electronics. Such damage is not covered by
the warranty. Grounding straps and kits are available from
electronics suppliers.
1. Turn OFF the power.
2. Remove the battery pack.
3. remove the pump cover or calibration cap, if installed.
4. Remove the sensor cover and sensors.
5. Remove the four remaining case mounting screws from the
back of the case.
When removing the back of the case, be careful not to pull
the pump wires from the connector. Use minimum force
necessary to disengage this connector to prevent breakage.
6. Remove the pump connector.
7. Disconnect the pump outlet tube. Place a small, flat
screwdriver at the base of the tube and gently pry the tube
away from the barb.
8. Tilt the circuit board up at a 90-degree angle to gain access to
the connectors on the under side.
9. Remove the display ribbon cable by sliding out the locking
tabs on the side of the connector.
10. Remove the membrane switch ribbon cable by sliding out the
locking tabs on the side of the connector.
11. Disconnect the back light fiber optics bundle by spreading
the two clips which hold the back of the LED onto the circuit
board.
12. Use a sharp X-acto knife to cut the green display mount from
the four mounting posts; be careful not to damage the
mounting posts.
6-12

CAUTION

CAUTION
Operating Manual

Advertisement

Table of Contents
loading

Table of Contents