EDITION 09 /2015
OPERATING MANUAL
Cable cross sections
Pump
Paint container
Conveyor
Spraying booth
Spraying stand
Procedure:
1. Screw on earthing cable with eyelet terminal.
2. Clamp the earthing cable clip to a earth
connection on site.
3. Earth the material (paint) container to a local
earth connection.
4. Earth the other parts of the system to a local earth
connection.
PART NO. ZZB028ENG
4 mm²; AWG 11
6 mm²; AWG 10
16 mm²; AWG 5
16 mm²; AWG 5
16 mm²; AWG 5
Unica 4-270 N
.
25