Download Print this page

Vestil AHSN Series Instruction Manual page 23

Knockdown steel adjustable-height gantry cranes

Advertisement

Connect the load to the hoist chain/cable, according to the instructions supplied with your hoist and the
method applied at your work site; then raise the load only as high as is necessary to position it. Once the load is
properly centered above the work location, lower the load until it is fully supported by the ground or work surface
and disconnect the load from the hoist. Return the crane and hoist to their storage locations.
If you must move the load to a different location, return the load to the ground and disconnect it from the hoist.
Move the crane and load separately to the desired work location. Only use the crane to lift loads.
Festoon Kit (option)
Item no.
Part no.
2
28-016-169
3
28-145-002
4
42234
5
33008
6
36106
7
37030
8
11211
9
33012
10
45503
11
34785T4
12
CV200
13
O-RING15
14
FCOIL 143-001
Rev. 1/4/2017
Description
Hold down plate
I-beam clamp
3
/
in. -16 x 1in. turned eye bolt
8
3
/
in. zinc-plated flat washer
8
3
/
in. -16 zinc-plated hex nut
8
1
/
in. – 13 nylon insert lock nut
2
1
/
in. – 13 x 2 in. HHCS zinc-plated bolt
2
1
/
in. zinc-plated USS flat washer
2
1
/
in. wire rope (1 in. longer than 1-beam)
8
Quick-grip wire rope clamp
Plastic cable tie
Metal ring
Coiled power cord
Copyright 2017 Vestil Manufacturing Corp.
AHSN, MANUAL.doc
Quantity
2
4
2
2
2
4
4
8
1
2
7
6
1
Page 23 of 26

Advertisement

loading