12. Entry into service and revisions

12.1. Before entering the dampers into operation after assembly and after sequential revisions, checks and functionality tests
of all designs including operation of the electrical components must be successfully provided and finished. After entering into
operation, these revisions must be done according to requirement set by national regulations.
12.1.1. In case that dampers are found unable to serve for their function for any cause, it must be clearly marked. The oper-
ator is obliged to ensure that the damper is put into condition in which it is ready for function and meanwhile he is obliged to
provide the fire protection by another appropriate way.
12.1.2. Results of regular checks, imperfections found and all-important facts connected with the damper function must be
recorded in the "FIRE BOOK" and immediately reported to the operator.
12.2. Before entering the dampers into operation after their assembly and by sequential checks, the following checks must
be carried out for all designs.
12.2.1. Visual inspection of proper damper integration, inside damper area, damper blade, contact surfaces and silicon
sealing.
12.2.2. Check of damper blade displacement can be realize after actuating mechanism supply connec- tion or signal
connection from higher level control systems. Blade displacement from position "OPEN" to position "CLOSED" and return
displacement is checked.

13. Spare parts

13.1. Spare parts are supplied only on basis of an order.

Product data

14. Product label

14.1. Product label is placed on the damper casing
Fig. 17
Product label (Nameplate)
22
Lindab reserves the right to make changes without prior notice
Last modified: 2021-09-03
Rev: 2021-03-26