Download Print this page

Wilesco Steam Roller D375 Assembly Instructions Manual page 9

Advertisement

Assembly Instructions
Steam Roller D375, D376, D377 & Traction Engine D415, D416, D417
Stage 6, Boiler Assembly
Illustration 19
60
1 x steam supply valve
61
1 x boiler
62
1 x steam exhaust pipe
63
1 x steam whistle
64
1 x steam valve
65
1 x spring loaded safety valve
66
1 x oiler body
67
1 x oiler screw
68
1 x slot bolt M4 x 6mm
69
1 x seal diam. 10/6
70
4 x seals diam. 8/5
71
2 x seals diam. 7/4
56
3 x seals diam. 5.5/2.5
Illustration 21
Then the boiler is pushed into the burner chamber
(with the sight glass towards the control cabin) with
the valves pointing downwards. When the boiler
has been inserted into the chamber, it should be
turned, so that the valves point upwards.
The boiler is now fastened by the slot bolt (68)
The steam whistle (63) requires one ore two seals
(70) so that the lever is to the rear and can be
moved to the left or right. Do no over tighten.
Illustration 20
The large seal (69) is placed onto the spring loaded
safety valve (65). This is screwed into the boiler.
The steam valve (64) is screwed into the boiler (61)
with 1 or 2 seals (70) so that the lever is pointing to
the left (as seen from the sight glass).
For safety reasons the boiler and the spring
loaded safety valve are already assembled. The
boiler has been pressure tested in the factory to 4.5
bars.
Illustration 22
The small seals (56) are places into the opening of
the steam valve and lower cylinder. Then the steam
supply pipe (60) is screwed in. First of all tighten
slightly under the cylinder then at the steam valve.
Be carefully to screw-in correctly. Now tighten. Fit
the steam exhaust pipe (62) with seal (56) into the
cylinder and boiler, and tighten. Finally tighten the
cylinder with both slot bolts.

Advertisement

loading

Related Products for Wilesco Steam Roller D375