Installation / Performance Checklist - Nordyne P5RD Series User's Manual & Installation Instructions

R-410a single package air conditioner
Hide thumbs Also See for P5RD Series:
Table of Contents

Advertisement

INSTALLATION ADDRESS:
CITY ________________________
UNIT MODEL # ________________________________________
UNIT SERIAL # ________________________________________
Unit Installed Minimum clearances per
Figure 2 (page 5)?
INSTALLER NAME:
CITY _______________________
ELECTRICAL SYSTEM:
Electrical connections tight?
Line voltage polarity correct?
Rated Voltage: ______________________________________ VOLTS
L1-L2 Volts: ________________________________________ VOLTS
L1-L3 Volts: ________________________________________ VOLTS
L2-L3 Volts: ________________________________________ VOLTS
Avg. Volts: _________________________________________ VOLTS
Max. deviation of voltage
from avg. volts: ______________________________________ VOLTS
% Volt imbalance: ___________________________________ VOLTS
Blower Motor HP: ________ Sheave Setting ______________# Turns
Has the thermostat been calibrated?
Is the thermostat level?
Is the heat anticipator setting correct?
(If Applicable)
O'Fallon, MO
INSTALLATION / PERFORMANCE CHECK LIST
STATE ________________
YES
NO
STATE ________________
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
¢7091552¤
REFRIGERATION SYSTEM:
Was unit given 24 hr warm up period
for crankcase heaters?
Stage-1 Liquid Pressure (high side) ________________________
Stage-1 Suction Pressure (low side) ________________________
Has the owner's information been
reviewed with the customer?
Has the Literature Package been left
with the unit?
PLEASE LEAVE THESE INSTALLATION
INSTRUCTIONS WITH THE HOMEOWNER.
7091550
YES
YES
YES
INSTALLER
7091550 (Replaces 7089010)
Specifi cations and illustrations subject to change
without notice or incurring obligations.
Printed in U.S.A. (01/10)