Installation / Performance Checklist - Nordyne NS6QD SERIES User's Manual & Installation Instructions

Outdoor split system air conditioner with quick connect couplings
Table of Contents

Advertisement

INSTALLATION ADDRESS:
CITY ________________________
UNIT MODEL # ________________________________________
UNIT SERIAL # _______________________________________
Unit Installed Minimum clearances per
Figure 2 (page 5)?
INSTALLER NAME:
CITY _______________________
ELECTRICAL SYSTEM:
Electrical connections tight?
Line voltage polarity correct?
Rated Voltage: ___________________________________ VOLTS
L1-L2 Volts: _____________________________________ VOLTS
L1-L3 Volts: _____________________________________ VOLTS
L2-L3 Volts: _____________________________________ VOLTS
Avg. Volts: ______________________________________ VOLTS
Max. deviation of voltage
from avg. volts: ___________________________________ VOLTS
% Volt imbalance: ________________________________ VOLTS
Blower Motor HP: ________ Sheave Setting ___________# Turns
Has the thermostat been calibrated?
Is the thermostat level?
Is the heat anticipator setting correct?
(If Applicable)
Specifi cations & illustrations subject to change without notice or incurring obligations.
O' Fallon, MO | Printed in U.S.A. (07/10)
INSTALLATION / PERFORMANCE CHECK LIST
STATE ________________
YES
NO
STATE ________________
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
REFRIGERATION SYSTEM:
Was unit given 24 hr warm up period
for crankcase heaters?
Stage-1 Liquid Pressure (high side) ________________________
Stage-1 Suction Pressure (low side) ________________________
Has the owner's information been
reviewed with the customer?
Has the Literature Package been left
with the unit?
YES
NO
YES
NO
YES
NO
¢709217.¤
7092170

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ns6qd-024Ns6qd-030Ns6qd-036Ns6qd-042Ns6qd-048Ns6qd-060

Table of Contents