Start-Up

in contact. Adequate safeguards (including the use of protective enclosures where necessary) should be
taken with this equipment both to safeguard the public from injury and to prevent damage to the equipment,
its associated system, and the premises.
appropriate lockout procedures. Do not perform any service on or near the unit without first ensuring the unit
is de-energized.
by personnel authorized and qualified to do so. All such personnel shall be thoroughly familiar with the
equipment, the associated system and controls, and the procedures set forth in this manual. Proper care,
personal protective equipment, procedures, and tools must be used in handling, lifting, installing, operating,
maintaining, and repairing this equipment to prevent personal injury and/or property damage.
and access doors in place.
NOTICE: BAC units are typically installed immediately after shipment, and many operate year-
round. However, if the unit is to be stored for a prolonged period either before or after
installation, certain precautions should be observed, as outlined in section Prolonged Outdoor
Storage on Page 15.
For BALTIDRIVE
7 on Page 23) and the fan shaft bearings (see Page 24). At initial start-up, no bearing lubrication is required since the
bearings are factory lubricated prior to shipment.
For BALTIDRIVE
Fill the basin with fresh water to the overflow level via the make-up valve.
Set the make-up valve float so the water shuts off at the operating level (see Table 3 on Page 19).
Vertex™ Evaporative Condenser Operation & Maintenance Manual – Unit Operation and Storage
: Rotating equipment will cause severe personal injury or death to persons who come
: Risk of electrocution which will cause severe personal injury or death. Use
: The operation, maintenance, and repair of this equipment shall be undertaken only
: This equipment should never be operated without all fan screens, access panels,
Power Train units only, prior to seasonal start-up, lubricate the motor base adjusting screw (see Figure
®
Power Train units only, apply RUST VETO
®
to steel shafts.
®