4. Component Maintenance Procedures
Basin
The basin is constructed from one of the following materials of construction and the following maintenance applies to all basin
materials of construction.
•
Galvanized steel
•
TriArmor
Corrosion Protection System
®
•
Welded Type 304 stainless steel
Water Levels
•
Height is measured from unit's base (mounting point) to water level. Depth is measured from the interior basin floor to
water level.
•
The operating water level in the basin will vary with system thermal load (evaporation rate), the bleed rate employed, and
the make-up water supply pressure.
•
The make-up valve controls the operating level, which should be maintained at the levels shown in Table 3.
•
Check the operating water level monthly and readjust the float when necessary to maintain the recommended operating
level.
Vertex™ Evaporative Condenser Operation & Maintenance Manual – Component Maintenance Procedures
Operating
Model Number
Depth (in)
VRC-xxxxA-1012N-xx
9
VRC-xxxxA-1018N-xx
9
VRC-xxxxA-1024N-xx
9
VRC-xxxxA-1036N-xx
9
VRC-xxxxA-2012N-xx
9
VRC-xxxxA-2018N-xx
9
VRC-xxxxA-1212N-xx
9
VRC-xxxxA-1218N-xx
9
VRC-xxxxA-1224N-xx
9
VRC-xxxxA-1236N-xx
9
VRC-xxxxA-2412N-xx
9
VRC-xxxxA-2418N-xx
9
Table 3. Basin Water Levels (Measured from Inside the Basin)
Operating
Operating
Height (in)
Volume (gal)
15.43
254
15.43
385
15.43
508
15.43
770
15.43
508
15.43
770
15.43
254
15.43
385
15.43
508
15.43
770
15.43
508
15.43
770
Overflow
Volume (gal)
479
701
959
1,402
959
1,402
521
774
1,042
1,549
1,042
1,549
Page | 19