Flow Of Operation - Omron SYSMAC CP Series User Manual

Hide thumbs Also See for SYSMAC CP Series:
Table of Contents

Advertisement

12 Pulse Outputs
Wiring for S
An external power supply is required for S
Provide a DC24V external power supply to V+ and V- terminals as follows.
Wiring Example
Sinking outputs
V+
00
V-
COM(V-)
Although V- and COM(V-) are connected internally, also wire them externally.
Sourcing outputs
L
V+
00
V-
COM(V+)
Although V+ and COM(V+) are connected internally, also wire them externally.
Do not connect an external power supply to N

12-1-2 Flow of Operation

1
2
Create ladder
program
12-4
-type CPU Unit
L
L
01
02
COM
03
L
01
02
COM
03
PLC Setup
Cyclic task,
interrupt task
-type CPU Units when using the PWM output.
-type CPU Units.
• Setting is required for the following situations:
• Performing an origin search.
• Using the Limit Input Signal as an input to func-
tions other than origin searches.
Execute instructions related to pulse control.
Set pulse output 0 to 03, and whether to use termi-
nals 00 and 02, or 01 and 03 on the CIO 100 and
CIO 101 terminal blocks for pulse outputs.
CP2E CPU Unit Software User's Manual(W614)