Work Flow - Omron CJ2H-CPU6*-EIP Series Connection Manual

Ethernet/ip cj series, zw-series displacement sensor
Hide thumbs Also See for CJ2H-CPU6*-EIP Series:
Table of Contents

Advertisement

6.2. Work Flow

Take the following steps to set the tag data link for EtherNet/IP.
6.3 Setting Up the Displacement Sensor
6.3.1 Parameter Settings
6.4 Setting Up the PLC
6.4.1 Hardware Settings
6.4.2 Starting the CX-Programmer and
Connecting Online with PLC
6.4.3 Creating the I/O Table and
Setting the IP Address
6.4.4 Starting the Network Configurator
and Uploading the Configuration
6.4.5 Setting Tags
6.4.6 Setting Connections
6.4.7. Transferring the Tag Data Link
Parameters
6.5 Checking the EtherNet/IP
Communications
6.5.1 Checking the Connection Status
6.5.2 Checking Data that are Sent and
Received
6. EtherNet/IP Connection Procedure
Set up the Displacement Sensor.
Set the parameters for the Displacement Sensor.
Set up the PLC.
Set the hardware switches on the EtherNet/IP Unit.
Start the CX-Programmer and connect online with
the PLC.
Create the I/O table for the PLC and set the IP
address.
Start the Network Configurator and upload the
network configuration.
Register the tags of the send area and receive area.
Associate the tags of the target device with the tags
of the originator.
Transfer the set tag data link parameters to the PLC.
Confirm that the EtherNet/IP communications are
performed normally.
Check the connection status of EtheNet/IP.
Confirm that correct data are sent and received.
12

Advertisement

Table of Contents
loading

Table of Contents