Otolift Stairlifts
Installation may only be performed by trained
engineers.
Installation tools (tube 403060616 and cross
200060042) are required for placing drive unit
at rail.
Torque wrench is required for verifying torque
settings, according to verification before use
document.
1 - Requirements
Installation drawing is required before start.
Servicebox is required for programming chairlift.
The use of special workbench 908000000 is
recommended.
Installation manual
5
Need help?
Do you have a question about the Modul-Air and is the answer not in the manual?
Questions and answers