Hyundai HiE-S UF Series Installation Manual page 17

Hes iec
Hide thumbs Also See for HiE-S UF Series:
Table of Contents

Advertisement

HiE-SxxxHG Series
HiE-SxxxKN Series
HiE-SxxxKI Series
HiE-SxxxDI Series
HiE-SxxxKJ Series
HiE-SxxxDJ Series
HiE-SxxxHG Series
HiE-SxxxKN Series
HiE-SxxxKI Series
HiE-SxxxDI Series
HiE-SxxxKJ Series
HiE-SxxxDJ Series
HiE-SxxxHG Series
HiE-SxxxKN Series
HiE-SxxxKI Series
HiE-SxxxDI Series
HiE-SxxxKJ Series
HiE-SxxxDJ Series
Note: 1. Total wire length means positive plus negative cables length.
2. On the premise of not affecting the overall design scheme of the system, it is recommended that the modules of the horizontal plate
series (integrated wire box and located near the long side) be installed vertically, and the modules of the vertical plate series (split wire
box and located near the short side) be installed horizontally, to avoid unnecessary power generation loss caused by ash accumulation at
the bottom of the inclined installation.
Vertical mounting (head to tail connection)
In
this
connection
/ HiE-SxxxKJ Series the
total
HiE-SxxxKN Series / HiE-SxxxHG Series the total wire length must be at least 1300mm,Pay
attention to the positive and negative terminals and ensure that the modules are turned at
intervals.
Vertical installation (straight connection)
The total wire length of this connection mode must be at least 2800mm. For HiE-SxxxHG Series
,the total wire length must be at least 2300 mm.
Horizontal mounting (head to tail connection)
This connection mode has the total wire length must be at least 400mm. Each group string
needs to add a 1000mm jumper cable.
mode
HiE-SxxxDI Series / HiE-SxxxKI Series / HiE-SxxxDJ Series
,
wire
length
must
be
at
least 1500mm.