Download Print this page
Copernicus PDR20KD Assembly Manual

Copernicus PDR20KD Assembly Manual

Spring loaded drying rack

Advertisement

Quick Links

Spring Loaded Drying Rack
PDR20KD
Assembly Guide
Check out our other products online at www.copernicused.com
For assistance, please contact us by telephone at 1-800-267-8494 or email at info@copernicused.com.
Have your packing slip ready for reference.
Please Recycle
PDR20KD - Version A - Released July 7, 2022 - Copernicus Educational Products Inc.

Advertisement

loading
Need help?

Need help?

Do you have a question about the PDR20KD and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Copernicus PDR20KD

  • Page 1 Check out our other products online at www.copernicused.com For assistance, please contact us by telephone at 1-800-267-8494 or email at info@copernicused.com. Have your packing slip ready for reference. Please Recycle PDR20KD - Version A - Released July 7, 2022 - Copernicus Educational Products Inc.
  • Page 2 Please visit www.copernicused.com/warranty and complete the form within 10 business days from Warranty product assembly. By registering your product, you will be entered into a draw to win Copernicus product. PDR20KD - Version A - Released July 7, 2022 - Copernicus Educational Products Inc.
  • Page 3 This product is intended for indoor comercial use only. To reduce the risk of fire or electric Indoor Use shock, do not expose this product to rain or moisture. The internal components are not Only sealed from the environment. PDR20KD - Version A - Released July 7, 2022 - Copernicus Educational Products Inc.
  • Page 4 Locking Bar Arms (1 Left, 1 Right) M5 Lock Nut M6 Lock Nut Side Leg (1 left and 1 right) Allen Key Paper Catch (Not to Scale) Stretcher PDR20KD - Version A - Released July 7, 2022 - Copernicus Educational Products Inc.
  • Page 5 Install Casters Flip unit upside down. Press Casters firmly into the Base: Casters will click into place. If necessary, tap the caster in using a rubber mallet. PDR20KD - Version A - Released July 7, 2022 - Copernicus Educational Products Inc.
  • Page 6 Install Drying Racks Grid wires should be Incorrect orientation below frame wire Follow the steps below until all racks have been installed and secured on both sides. PDR20KD - Version A - Released July 7, 2022 - Copernicus Educational Products Inc.
  • Page 7 Tray from your packaging Replace it as often as you need, just cut a new one the following size: W 56 x D 38cm (W 22" x D 19") PDR20KD - Version A - Released July 7, 2022 - Copernicus Educational Products Inc.
  • Page 8 You will need: (Not to Scale) Adjustable wrench x1 Install Hold Down Bar Assemble the Hold Down Bar on the right side of the unit first (Valco button) PDR20KD - Version A - Released July 7, 2022 - Copernicus Educational Products Inc.
  • Page 9 Using Locking Bar To release the Locking Bar press the locking mechanism inwards and lift up, to lock the Locking Bar press down until you hear a click. PDR20KD - Version A - Released July 7, 2022 - Copernicus Educational Products Inc.