Texas Instruments TPS7A3301EVM-061 User Manual page 8

Table of Contents

Advertisement

Schematic and Bill of Materials
RefDes
COUNT
C1
0
C2
1
C3
1
C4
1
C5–C9
5
C10
0
HS1
1
J1–J4
4
JP1
1
R1
1
R2
1
U1
1
1
1
1
1
8
TPS7A3301EVM-061
Table 1. TPS7A3301EVM-061 Bill of Materials
Value
Description
Capacitor, ceramic, 50 V,
47 µF
X5R, 10%
Capacitor, ceramic, 50 V,
1 µF
X5R, 10%
Capacitor, ceramic, 50 V,
1 µF
X5R, 10%
Capacitor, ceramic, 25 V,
0.01 µF
X5R, 10%
Capacitor, ceramic, 25 V,
10 µF
X5R, 10%
Capacitor, ceramic, 16 V,
47 µF
X5R, 10%
Heatsink, TO-220,
13.4°C/W
vertical-mount
Header, male 2-pin,
PEC02SAAN
100-mil (2.54-mm) spacing
Header, male 3-pin,
PEC03SAAN
100-mil (2.54-mm) spacing
604 kΩ
Resistor, chip, 1/16W, 1%
51.1 kΩ
Resistor, chip, 1/16W, 1%
IC, –36-V, –1-A,
TPS7A3301KC ultralow-noise negative
linear regulator
Shunt, black
Screw, hex mach. 4-40 ×
1/2 S/S
Hdwr. mtg. nut, 0.062-inch
× 0.184-inch (1.59-mm ×
4.67-mm)
PCB, 1.555-inch × 2-inch × 1.5 inch × 2 inch × 0.062
PCB
0.062-inch (3.95-cm ×
5.08-cm × 1.59-mm)
Copyright © 2011, Texas Instruments Incorporated
Size
2220
0805
0603
0603
0805
2220
1 inch × 1.375 inch (2.54 cm
× 2.49 cm)
0.1 inch (2.54 mm) × 2
0.1 inch (2.54 mm) × 3
0603
0603
TO-220
100 mil (2.54 cm)
4-40 × 1/2 S/S
0.062 inch × 0.184 inch (1.59
mm × 4.67 mm)
-inch (3.81 cm × 5.08 cm ×
1.59 mm)
Submit Documentation Feedback
www.ti.com
Part Number
MFR
STD
STD
STD
STD
STD
STD
STD
STD
STD
STD
STD
STD
507302B00000G
Aavid
PEC02SAAN
Sullins
PEC03SAAN
Sullins
STD
STD
STD
STD
TPS7A3301KC
TI
929950-00
3M
HMSSS 440 0050 STD
7248-3
STD
PWR061
Any
SLVU602 – November 2011

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPS7A3301EVM-061 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents