SCP-PLL722-010-04H
3
Use the
key to move to the desired circuit to test, then press
TAB
A warning displays when a channel is selected for the test.
Performing an SDT on one of the POTS or ISDN channel interrupts service on the line under test. The
remaining lines on the PG-Plus system remains in service.
Upon tests completion the SDT Results screen displays Subscriber Test, Failure Condition, and Test Status.
Tests are performed in the order of display. If a test fails, the remaining tests are not performed (as per
TR-909). It takes approximately seven to eight seconds for all tests to complete.
If you selected the POTS option, the following screen displays:
PLL-722 List 1
ENTER
January 6, 2003
Test Submenu
.
33