5. Installation
Before installing the UPS, select a proper location to install the UPS.
• Place the UPS on a flat and clean surface, away from vibration, dust, humidity, high temperature, flammable liquids and
gases and corrosive and conductive contaminants. Install the UPS indoors in a clean environment, away from windows
and doors.
• Use the UPS at a maximum altitude of 3281 ft. (1000 m) to keep UPS normal operation at full load. In high-altitude areas,
reduce the connected load. Altitude derating power with connected loads for normal operation is listed as below:
Based on density of dry air =1.225 kg/m3 at sea-level,+15ºC
Because fans lose efficiency with altitude, force air-cooled equipment will have a smaller derating.
1
The UPS is equipped with a fan for cooling. Place the UPS in a well-ventilated area. Maintain minimum clearance of
4 in. (100 mm) in front of the UPS and 12 in. (300 mm) in the back and on the sides of the UPS for heat dissipation
and maintenance.
Altitude
3281 ft. (1,000 m)
4921 ft. (1,500 m)
6562 ft. (2,000 m)
8202 ft. (2,500 m)
9843 ft. (3,000 m)
11,483 ft. (3,500 m)
13,123 ft. (4,000 m)
14,764 ft. (4,500 m)
16,404 ft. (5,000 m)
Derating factor
1.0
0.95
0.91
0.86
0.82
0.78
0.74
0.7
0.67