HP HPE ProLiant DX360 Gen10 User Manual page 140

Table of Contents

Advertisement

11. Connect each power cord to the power source.
12. Power up the server.
Installing an energy pack in 8 SFF and 4 LFF configurations
Prerequisites
Before installing this option, be sure you that have the components included with the hardware option kit.
Procedure
1.
Power down the server (Power down the server).
2.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3.
Do one of the following:
a. Extend the server from the rack.
b. Remove the server from the rack.
4.
Remove the access panel.
5.
Install the energy pack and connect the energy pack cable.
IMPORTANT: To enable SmartCache or CacheCade in a P-class type-p Smart Array controller, you must:
Connect the controller backup power cable to the controller backup power connector on the system or
riser board.
Connect the energy pack cable to the energy pack connector on the system board.
Hardware options installation
140

Advertisement

Table of Contents
loading

Table of Contents