Tape up underneath the damper interface shroud
to protect against penetration of mortar into the
interface shroud. It is important that no mortar
enters the shroud.
Horioztonal Damper Installation
SPAN (access side above)
Actionair SmokeShield PTC - [AA/F 12368]
Installation Method
1. Bolt Unistrut (1.5mm minimum thickness) supports to
4 damper cleats and position damper in aperture with
minimum M10 bolts.
2. Fix Unistrut supports to the floor with minimum ø6mm
fire rated fixings.
3. Shutter underneath with 50mm thick Shutterbatt.
IMPORTANT – to prevent any compound pouring into
the damper interface shroud and rendering the damper
inoperable the following MUST be followed: Do NOT
remove damper interface transit plate. Tape up under-
neath damper interface shroud. Do NOT fill above
damper casing
4. Using thick consistency compound, trowel in the first
layer of approximately 25mm, all around the damper
casing, making sure all the gaps are fully sealed, as per
industry standard.
5. When the first layer has set, pour in the next level to
100mm thickness. IMPORTANT;Compound must not
be too watery or runny as it risks penetrating into the





20220811 - L00009 (1.2)
Actionair SPAN Installation Guide







interface shroud. Do NOT fill above damper casing
6. When compound has fully set, remove damper inter-
face transit plate and check the internal is free from any
debris, remove any debris.
7. Follow the actuator installation procedure detailed in
this document.
Swegon reserves the right to alter specifications.













For detailed installation, please
view document ED-AA-4.
© Swegon Air Manage
South Street, Whitstable,
Tel: +44 (0)1227
Email: actionair@sw
www.swegon.co
Installation
If your proposed installation
that shown here, please disc
authority having jurisdiction,
documentation.
Deviation from this drawing
of the relevant authority.
Connecting ductwork omitte
Ductwork must be independ
There must be an appropria
joint between the damper an
ductwork on both sides of th
A minimum of 200mm betwe
installed in separate ducts a
fire damper and construction
needs to be observed unles
specified in the drawing.
SC
Pleas
for la
f
com
Insta
and M
B
ECN2227
A
ECN1932
Rev:
Comments:
Drawn By:
M. Bushell
Kimberley.M
Checked By:
Gore.S
Approved By:
Description:
HORIZONTAL APP
SMOKE SHIELD + C
SEAL - SPAN, ACC
ABOVE
Damper Size Ran
200 x 200 to 100
Reference No:
AAF12368
1
3

Advertisement

Table of Contents
loading

Table of Contents