Replacement Of The; Stage Lever Rubber Top - Zavoli GE Manual

Table of Contents

Advertisement

Fig. 2.1-2

2.2 Replacement of the 2

nd
To replace the 2
stage lever rubber top, pinch the top end of the rubber top with two fingers.
Then, carefully remove the rubber top (Fig. 2.2-1 / 2.2-2 and 2.2-3).
GEXL regulator, please use the 10012CR cut-off included in the 100K05 overhaul kit!!!!
Fig. 2.2-1
ZAVOLI s.r.l. Via Pitagora n° 400 47023 Fr. Case Castagnoli, CESENA (FC), Italy
Technical Directions
for the Overhaul of
GE – GES – GEX – GEXL
Regulators/Vaporizers
Fig. 2.1-1
nd

stage lever rubber top

Page 9 of 32
Tel. (+39) 0547/ 646409 – Telefax (+39) 0547 / 646411
Web site:
www.zavoli.com
Fig. 2.1-3
When working with a
Fig. 2.2-2
E-mail:
zavoli@zavoli.com
DT_IS_RG-007.00-E
09/10/2009

Advertisement

Table of Contents
loading

This manual is also suitable for:

GesGexGexl

Table of Contents