Reassembly Of The Regulator/Vaporizer; Installation Of The Cut-Off Valve On The; St Stage Lever - Zavoli GE Manual

Table of Contents

Advertisement

3 Reassembly of the Regulator/Vaporizer

Before proceeding to reassemble the components of the regulator/vaporizer (Fig. 3-1),
please make sure that all O-Ring seats are in perfect working condition to avoid potential
leaks. Also make sure that the new O-Rings are well lubricated before they are installed!!!

3.1 Installation of the cut-off valve on the 1

With a punch, insert the cut-off valve in its operating seat (Fig. 3.1 / 3.1-1 / 3.1-2 and 3.1-3),
making sure that the central part of the cut-off does not get damaged in the process.
Fig. 3.1
ZAVOLI s.r.l. Via Pitagora n° 400 47023 Fr. Case Castagnoli, CESENA (FC), Italy
Technical Directions
for the Overhaul of
GE – GES – GEX – GEXL
Regulators/Vaporizers
Fig. 3
st
stage lever
Page 14 of 32
Tel. (+39) 0547/ 646409 – Telefax (+39) 0547 / 646411
Web site:
www.zavoli.com
E-mail:
Fig. 3.1-1
zavoli@zavoli.com
DT_IS_RG-007.00-E
09/10/2009

Advertisement

Table of Contents
loading

This manual is also suitable for:

GesGexGexl

Table of Contents