Installation Of The; Nd Stage Lever; Installation Of The High-Pressure Diaphragm - Zavoli GE Manual

Table of Contents

Advertisement

3.5

Installation of the 2

nd
To place the 2
stage lever in the correct operating position, please refer to the pictures below
(Fig. 3.5 and 3.5-1). Insert the pin and secure the regular screws into their seats (Fig. 3.5-2).
Fig. 3.5

3.6 Installation of the high-pressure diaphragm

To install the high-pressure diaphragm, please refer to the following directions.
Diaphragm for GE regulators/vaporizers
ZAVOLI s.r.l. Via Pitagora n° 400 47023 Fr. Case Castagnoli, CESENA (FC), Italy
Technical Directions
for the Overhaul of
GE – GES – GEX – GEXL
Regulators/Vaporizers
nd
stage lever
Fig. 3.5-2
Page 17 of 32
Tel. (+39) 0547/ 646409 – Telefax (+39) 0547 / 646411
Web site:
www.zavoli.com
Fig. 3.5-1
E-mail:
zavoli@zavoli.com
DT_IS_RG-007.00-E
09/10/2009

Advertisement

Table of Contents
loading

This manual is also suitable for:

GesGexGexl

Table of Contents