Finishing The Indoor Unit Installation; To Insulate The Drain Piping, Refrigerant Piping And Interconnection Cable; To Pass The Pipes Through The Wall Hole - Daikin FTXP71N2V1B Installer's Reference Manual

Hide thumbs Also See for FTXP71N2V1B:
Table of Contents

Advertisement

9 Finishing the indoor unit installation

9.1 To insulate the drain piping, refrigerant piping and interconnection
cable

9.2 To pass the pipes through the wall hole

FTXP-N
Daikin room air conditioner
4P518023-14L – 2022.06
f
g
h
a Slit
b Heat insulation pipe cover
c Liquid pipe
d Gas pipe
e Drain pipe
f Interconnection wire
g Insulation tape
h Vinyl tape
1 After the drain piping, refrigerant piping and the electrical wiring are finished.
Wrap refrigerant piping, interconnection cable and drain hose together using
insulation tape. Overlap at least half the width of the tape with each turn.
a
b
f
e
a Drain hose
b Interconnection cable
c Mounting plate (accessory)
d Refrigerant piping
e Indoor unit fixing screw M4×12L (accessory)
f Bottom frame
1 Shape the refrigerant pipes along the pipe path marking on the mounting
plate.
a
b
c
a Drain hose
b Caulk this hole with putty or caulking material
c Adhesive vinyl tape
d Insulation tape
e Mounting plate (accessory)
9
Finishing the indoor unit installation
|
a
b
c
d
e
c
d
c
d
e
Installer reference guide
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ftxp60n2v1bFtxp50n2v1b

Table of Contents