11.2 To perform a test run..............12 11.2.1 To perform a test run in winter season ....... 12 ▪ The full set of latest technical data is available on the Daikin Business Portal (authentication required). 12 Disposal 13 Technical data 13.1...
WARNING Use an all-pole disconnection type breaker with at least 3 mm between the contact point gaps that provides full disconnection under overvoltage category III. FTXP-N Installation manual Daikin room air conditioner 3P695637-2A – 2022.06...
(field supply), in order to prevent water leakage. 1 Drill a 80 mm large feed-through hole in the wall with a downward slope towards the outside. Wall embedded pipe (field supply) Installation manual FTXP-N Daikin room air conditioner 3P695637-2A – 2022.06...
2 Gradually pour approximately 1 l of water in the drain pan, and check for water leaks. Right-side piping Right-bottom piping Right-back piping Remove the pipe port cover here for right side piping Remove the pipe port cover here for right-bottom piping FTXP-N Installation manual Daikin room air conditioner 3P695637-2A – 2022.06...
▪ Do NOT branch the power supply for the drain pump, etc. from the terminal block. This could result in electrical shock or fire. Connecting the refrigerant piping DANGER: RISK OF BURNING/SCALDING Installation manual FTXP-N Daikin room air conditioner 3P695637-2A – 2022.06...
▪ Do NOT bend refrigerant pipes. ▪ Do NOT push the refrigerant pipes onto the bottom frame or the front grille. INFORMATION: Declaration of conformity ▪ Daikin Industries Czech Republic s.r.o. declares that the radio equipment type inside of this unit is in compliance with Directive ...
1 Turn on the power supply and check that the RUN lamp of the 6 Snap the top of the upper case into the clip at the top of the product blinks. lower case and press to close the box. FTXP-N Installation manual Daikin room air conditioner 3P695637-2A – 2022.06...
Prerequisite: Power supply MUST be in the specified range. commissioning instructions in this chapter, a general Prerequisite: Test run may be performed in cooling or heating commissioning checklist is also available on the Daikin mode. Business Portal (authentication required). Prerequisite: Test run should be performed in accordance with the...
▪ A subset of the latest technical data is available on the regional Light emitting diode (service Daikin website (publicly accessible). monitor green) ▪ The full set of latest technical data is available on the Daikin HIGH VOLTAGE High voltage Business Portal (authentication required).