Hide thumbs Also See for FTXP20L2V1B:

Advertisement

Installation manual

Daikin room air conditioner
FTXP20L2V1B
FTXP25L2V1B
FTXP35L2V1B
FTXP50L2V1B
FTXP60L2V1B
FTXP71L2V1B
ATXP20L2V1B
ATXP25L2V1B
ATXP35L2V1B
FTXF20A2V1B
FTXF25A2V1B
FTXF35A2V1B
FTXF50A2V1B
Installation manual
FTXF60A2V1B
English
Daikin room air conditioner
FTXF71A2V1B

Advertisement

Table of Contents
loading

Summary of Contents for Daikin FTXP20L2V1B

  • Page 1: Installation Manual

    Installation manual Daikin room air conditioner FTXP20L2V1B FTXP25L2V1B FTXP35L2V1B FTXP50L2V1B FTXP60L2V1B FTXP71L2V1B ATXP20L2V1B ATXP25L2V1B ATXP35L2V1B FTXF20A2V1B FTXF25A2V1B FTXF35A2V1B FTXF50A2V1B Installation manual FTXF60A2V1B English Daikin room air conditioner FTXF71A2V1B...
  • Page 2 3P511700-1A...
  • Page 3 3P511700-2A...
  • Page 4 3P511700-3A...
  • Page 5 3P511700-7B...
  • Page 6: Table Of Contents

    5.1.1 To open the indoor unit ..........Daikin website (publicly accessible). Installing the indoor unit ............▪ The full set of latest technical data is available on the Daikin 5.2.1 To install the mounting plate ........extranet (authentication required). 5.2.2 To drill a wall hole ............
  • Page 7: About The Unit

    Preparing the installation site (mm) WARNING The appliance shall be stored in a room without continuously operating ignition sources (example: open flames, an operating gas appliance or an operating electric heater). (A)(F)TXP20~71L2V1B + FTXF20~71A2V1B Installation manual Daikin room air conditioner 3P512025-1C – 2018.01...
  • Page 8: Preparing Refrigerant Piping

    2 Remove the front panel by sliding it to the left or the right and on the front grille. pulling it toward you. 3 Install the air filter and then mount the front panel. Installation manual (A)(F)TXP20~71L2V1B + FTXF20~71A2V1B Daikin room air conditioner 3P512025-1C – 2018.01...
  • Page 9: Installing The Indoor Unit

    4 Finish the installation by securing the mounting plate on the wall using screws. INFORMATION The removed pipe port cover can be kept in the mounting plate pocket. (A)(F)TXP20~71L2V1B + FTXF20~71A2V1B Installation manual Daikin room air conditioner 3P512025-1C – 2018.01...
  • Page 10: To Drill A Wall Hole

    To connect the piping on right-side, right-bottom, left-side or left- bottom, the pipe port cover MUST be removed. 1 Cut off the pipe port cover from inside the front grille using a coping saw. Installation manual (A)(F)TXP20~71L2V1B + FTXF20~71A2V1B Daikin room air conditioner 3P512025-1C – 2018.01...
  • Page 11: To Provide Drainage

    2 Remove the drain plug on the left side and attach it to the right side. (A)(F)TXP20~71L2V1B + FTXF20~71A2V1B Installation manual Daikin room air conditioner 3P512025-1C – 2018.01...
  • Page 12: Connecting The Refrigerant Piping

    Make sure to insulate all refrigerant piping. Any exposed Connecting the refrigerant piping piping might cause condensation. DANGER: RISK OF BURNING Connecting the electrical wiring DANGER: RISK OF ELECTROCUTION Installation manual (A)(F)TXP20~71L2V1B + FTXF20~71A2V1B Daikin room air conditioner 3P512025-1C – 2018.01...
  • Page 13: To Connect The Electrical Wiring On The Indoor Unit

    Small animals that make contact with electrical parts can cause malfunctions, smoke or fire. Drain hose Caulk this hole with putty or caulking material. (A)(F)TXP20~71L2V1B + FTXF20~71A2V1B Installation manual Daikin room air conditioner 3P512025-1C – 2018.01...
  • Page 14: To Fix The Unit On The Mounting Plate

    Address jumper NOTICE Model Button FTXP-L and ATXP-L Be careful NOT to damage any of the surrounding parts Keep pressed for about when cutting the address jumper. 5 seconds. Installation manual (A)(F)TXP20~71L2V1B + FTXF20~71A2V1B Daikin room air conditioner 3P512025-1C – 2018.01...
  • Page 15: Commissioning

    The stop valves (gas and liquid) on the outdoor unit are fully open. To perform a test run Prerequisite: Power supply MUST be in the specified range. Prerequisite: Test run may be performed in cooling or heating mode. (A)(F)TXP20~71L2V1B + FTXF20~71A2V1B Installation manual Daikin room air conditioner 3P512025-1C – 2018.01...
  • Page 16: Technical Data

    9 Technical data Technical data A subset of the latest technical data is available on the regional Daikin website (publicly accessible). The full set of latest technical data is available on the Daikin extranet (authentication required). Wiring diagram Unified Wiring Diagram Legend For applied parts and numbering, refer to the wiring diagram on the unit.
  • Page 20 3P512025-1C 2018.01...

Table of Contents