LOCATION
The refrigerated merchandisers have been designed
for use only in air conditioned stores where temperature
and humidity are maintained at or below 75°F and
55% relative humidity. DO NOT allow air conditioning,
electric fans, ovens, open doors or windows (etc.) to
create air currents around the merchandiser, as this
will impair its correct operation.
Product temperature should always be maintained
at a constant and proper temperature. This means
that from the time the product is received, through
storage, preparation and display, the temperature
of the product must be controlled to maximize life of
the product.
UNCRATING THE STAND
Place the fi xture as close to its permanent position
as possible. Keep in place, attached case until ready
to set/bolt to adjoining case.
TIGHTEN GLASS SCREWS
Tighten screws along clamshell located on
the underside of glass before placing unit into
operation.
EXTERIOR LOADING
These models have not been structurally designed to
support excessive external loading. Do not walk on
their tops. This could cause serious personal in jury
and damage to the fi xture.
SETTING AND JOINING
The sectional construction of these models enable
them to be joined in line to give the effect of one
continuous display.
An Alignment pin kit is supplied with every case and
must be used in alignment.
Cut & Plan Views
9 1/2"
STRAIGHT
DRAIN
REF.
DROP
4 3/8"
45° O/S
Q3-DC Plan View
Straight plan view with
Inside and Outside Wedges

Installation

LEVELING
Important! It is imperative that cases
be leveled from front to back and side
to side prior to joining. A level case is
necessary to insure proper operation,
water drainage, glass alignment, and
operation of the hinges supporting the
glass. Leveling the case correctly will
solve all hinge operation and glass
alignment problems.
NOTE: A. To avoid removing concrete fl ooring, begin lineup leveling
from the highest point of the store fl oor.
B. When wedges are involved in a lineup, set them fi rst.
All cases were leveled and joined prior to shipment to
insure the closest possible fi t when cases are joined
in the fi eld. When joining, use a carpenters level and
adjust legs accordingly. The legs on the Q3-DC are
adjustable and do not require shims. Simply screw
the leg up or down to adjust height.
1. Using case blueprints, measure off and mark
on the fl oor the exact dimensions of where the
cases will sit. Snap chalk line for front and back
positions of base rail or pedestal. Mark the
location of each joint front and back. Find the
highest point throughout the lineup. FLOORS
ARE NORMALLY NOT LEVEL! Determine the
highest point of the fl oor; cases will be set off
this point. All cases in the entire lineup must be
brought up to the highest level of the case sitting
at the highest point in the lineup. This may be
done a few different ways. 1) Walk the fl oor
looking for any mounds or dips. 2) Use a string
level. 3) Use a transit. If a wedge is used in the
middle of a lineup, the wedge must be set on the
highest point on the fl oor FIRST, with the rest
if the lineup being leveled from it. The Q3-DC
case has adjustable legs to allow for leveling.
3
C L
Drain 5" from
Center LIne
4'
45° I/S
6 1/8"
DRAIN
REF.
DROP
48"
Scale = 1/2"
DRAIN
6 1/4"