Start-Up Of The Paul; Station; Figure 14: Opv With Rotated Float Arm (Transport Position); Figure 15: Opv Correct Adjusted - WaterBackpack PAUL Station Manual

Hide thumbs Also See for PAUL Station:
Table of Contents

Advertisement

®
PAUL

station

manual
page 21
Finally the OPV should look like can be seen in Figure 15.

Figure 14: OPV with rotated float arm (transport position)

Figure 15: OPV correct adjusted

®
5.2 Start-up of the
PAUL
station
After having assembled everything, please clean all installations, especially the
FWT. Please close all valves and then follow these steps:
fill RWT and check OPS
PAUL Station Manual 2019-08-02
www.waterbackpack.org
02.08.2019

Advertisement

Table of Contents
loading

Table of Contents