PAUL station
manual
Figure 14:
5.2 Start-up of the
After having assembled everything, please clean all installations, especially the FWT. Please
close all valves and then follow these steps:
fill RWT and check OPS
in order to speed up, you can test the OPS in a low level position, so not too much
water is needed before the autostop waterlevel is reached
open
the valve in the hose between
PAUL Station Manual 2019-05-25
OPV with rotated float arm (transport position)
Figure 15:
®
PAUL
station
OPV correct adjusted
®
PAUL
and the FWT
page 18
25.05.2019