Temporary Stop Of Operation - WaterBackpack PAUL Station Manual

Hide thumbs Also See for PAUL Station:
Table of Contents

Advertisement

page 22
 in order to speed up, you can test the OPS in a low level position, so
not too much water is needed before the autostop waterlevel is reached
 open
the valve in the hose between
open the valve in the connection between RWT and
®
slowly is filled. If present, make sure to enable the LWS, so you
PAUL
can also check its function right now
 You can observe the water level rising in the transparent side outlet
hose
After some time close in the hose between
 This is to check whether the OPV in
successful test (please listen to the water flowing into
tle sound must disappear without water overfilling
again
fill FWT (without tapping water) and check whether the SV in the FWT inlet
closes properly when the FWT is full (this will take some time depending
upon the volume of the FWT, but the
tended during this test)
remember not to drink the first 200 Liter of water as there might be a
sweet taste from glycerine (which is not harmful!) which is used to preserve
new membranes and which will be flushed out during the first usage.

5.3 Temporary stop of operation

If the operation of
hours, some days, but not several weeks), then please stop the process by first
closing the valve in the hose between
®
that
PAUL
is filled with water during pause, which is necessary. Observe the
water level in the side outlet transparent hose. Water level inside
be at least half the height of
Then, all other necessary steps (switching off machines, closing taps etc.) can
be done.
PAUL Station Manual 2019-08-02
®
PAUL
station
must be stopped for a short time (e.g. some
®
PAUL
www.waterbackpack.org
®
PAUL
and the FWT
PAUL
®
PAUL
is working properly. After
®
PAUL
station
®
PAUL
and the FWT. This assures
.
®
PAUL
station
®
PAUL
unit
®
and the FWT
®
PAUL
. This gen-
®
PAUL
), open it
can be left unat-
PAUL
manual
®
should
02.08.2019

Advertisement

Table of Contents
loading

Table of Contents