Installing Lower Front Panels - Hussmann IMPACT Elite E1 Installation And Operation Manual

Self-service meat, delicatessen, dairy and produce merchandisers
Hide thumbs Also See for IMPACT Elite E1:
Table of Contents

Advertisement

3-2
D
P
RIP

INSTALLING LOWER FRONT PANELS

The lower front panels are shipped inside each
merchandiser. A
FTER
leveled and joined, and all drip piping, electrical
and refrigeration work has been completed,
install the lower front panel.
To Install Lower Front Panel
1. The lower front panel supports are designed
to fit into the slots on the top of the lower
front panel.
2. Once the top is positioned, lift the panel up
and drop it over the tabs on the front close-off
brackets.
Lower Front Panel
Lower Front Panel Support
Front Close-off Bracket
P/N 0453523
L
IPING AND
OWER
merchandisers have been
P
ANELS
Space between the Lower Front Panel and the
floor may be covered using a vinyl cove base
trim (field supplied). The size of trim needed will
depend on how much the floor is out of level.
To install the trim to the front panel:
1. Remove all dirt, wax and grease from the area
of the lower front panel where adhesion will
be necessary. This is to ensure a good and
secure installation.
2. Apply a good contact cement to the cove trim
and allow proper drying time according to the
directions supplied with the cement.
3. Install the trim on the lower front panel so
that it is lying flush with the floor. D
SEAL THE TRIM TO THE FLOOR
4. If required by local health codes the Cove
Trim may be sealed to the floor, using a sili-
cone type sealer. Sealant must be removed
and replaced when servicing.
.
Cove Trim
O NOT
Contact
Cement

Advertisement

Table of Contents
loading

Table of Contents