1-2
INSTALLATION
WARNING
!
Do NOT remove shipping braces until the
merchandisers are properly anchored to the
floor. Merchandisers are top heavy and
could tip over causing serious injury.
Merchandisers must be braced before
removing the lag bolts.

SHIPPING BRACES

Move the merchandiser as close as possible to
its permanent location and then remove all
packaging. Check for damage before discarding
packaging. Remove all separately packed acces-
sories such as kits and shelves.

EXTERIOR LOADING

Do NOT walk on top of merchandisers or
damage to the merchandisers and serious personal
injury could occur. T
DESIGNED TO SUPPORT EXCESSIVE EXTERNAL LOAD
such as the weight of a person. Do not place
ING
heavy objects on the case.
MERCHANDISERS SHIPPED
WITH END INSTALLED
If the case was shipped with the end installed, two
long bolts were used to hold the shipping brace to
the end. If the shipping bolts are reinserted after
removing the brace, they will extend into the prod-
uct area. T
,
HEREFORE
BOLTS WITH THE SHORTER BOLTS PROVIDED
Be careful not to damage the factory-installed end
while moving the case. Make sure that tools are
positioned past the end and beneath the merchan-
diser's support bar.
P/N 0416183C
HEY ARE NOT STRUCTURALLY
BE SURE TO REPLACE THESE
.

ANCHORING

Because of the merchandisers' forward projection,
they must be anchored to the floor to prevent them
from tipping forward. Each merchandiser should
be lagged to the floor through its rear skid.
Anchors should be placed approximately 8 to
12 in. (203 mm to 305 mm) from each end and in
the center of the rear skid. Some merchandisers
have holes in the rear skid for this purpose.
Once the merchandisers are properly anchored,
remove shipping braces.

LEVELING

Merchandisers must be installed level to ensure
proper operation of the refrigeration system and to
ensure proper drainage of defrost water. When
leveling merchandisers, use a carpenter's level as
shown. Leveling shims are provided with each
merchandiser for use if needed. The shims are
12 in. (305 mm) long and 3 in. (76 mm) wide so
that you can level adjoining merchandisers at the
-
same time using one shim.
Use Levels Here
Shim

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Impact f6l

Table of Contents