Download Print this page

Cisco IGX 8400 Series Installation And Configuration Manual page 42

Cisco systems hub/switch installation and configuration guide
Hide thumbs Also See for IGX 8400 Series:

Advertisement

Attaching Peripherals
Step 6
D2.cb1
Active IP Address:
IP Subnet Mask:
TCP Service Port:
Default Gateway IP Address:
Maximum LAN Transmit Unit:
Ethernet Address:
Control Socket - Ready
Base Socket Descriptor - 1
Open Socket Descriptor - 2
Last Command: dsplan
Next Command:
3-42 Cisco IGX 8400 Series Installation and Configuration
After the workstation and IGX node interface have been set up, Cisco WAN Manager can
be started. After Cisco WAN Manager has started and the communication sockets are
active, the dsplan screen looks like this:
LAN
cisco IGX 8410
"Sockets" is the BSD UNIX name for connections between processes and
Note
typically applies to network communication.
Note
Before switching on the Cisco WAN Manager workstation, refer to the Cisco WAN
Manager Operations publication.
9.3 Feb. 27 2000 14:27 PST
192.187.207.21
255.255.255.0
5130
192.187.207.1
1500
00.55.43.00.04.55

Advertisement

loading